Casey Group

Previous slide
Next slide

These rack and pinion hoists with steel segment masts have earned their good reputation over the years being a reliable partner for construction workers.

Their spacious load platforms offer enough space for two wheelbarrows or large pallets as well as fixing devices for bulky construction materials. The steel mast system allows for easy assembly from the platform up to a height of 100 m.

Safe unloading of the transported materials is granted by the platform’s being able to be turned by 90°. Loading at the base unit is carried out parallel to the building. This can be very space saving and a decisive feature on narrow construction sites!

A patented mono-axis trailer for transporting and automatically putting down/ loading the hoist is offered as accessory.

The GEDA 500 Z Duo is available with load-through and rotable platform.

Click Here for Brochure