Casey Group

Previous slide
Next slide

The small, lightweight and handy GEDA 200 Z – our ideal hoist for scaffolders and construction workers.

The base unit includes chassis, cable bin and trailing cable.

The mast with the toothed rack can be fixed to the scaffold using only one tube. The anchoring distances are 4m. The entire unit only requires an area of 1,5 x 1,5m on the ground, which makes it possible to load the hoist parallel to the building without any problems. Unloading at the landing levels can be easily done by turning the platform.

The lightweight platform (only 44 kg) can be turned by 90° to the left and to the right.

The GEDA design and development team has constructed the GEDA 200 Z to be easily serviced and maintained, i.e.easy access to handy components.

Click Here for Brochure