Casey Group

Previous slide
Next slide

The permanently installed transport platform GEDA 1200 ZP P is the strong and versatile partner for heavy loads and efficient work. Man and material are transported reliably, quickly and above all safely up and down. The diverse application possibilities in the industry range from asphalt mixing plants to power plants to cement plants, chemical plants and warehousing / logistics.

The flexible system makes the GEDA 1200 ZP P individually adaptable to customer requirements and local conditions. Thus, in addition to three different speed variants and extensive stage versions are available. Despite the high load capacity of 1500 kg, the transport platform GEDA 1200 ZP P is guided on just one mast.