Skip to content
TwitterLinkedInFacebook
Casey Group Logo

  • HOME
  • Cranes
    • Crane Hire
      • Crane Hire Kildare
      • Crane Hire Dublin
    • Crane Sales
  • Skips
    • Skip Hire
      • Skip Hire Dublin
      • Skip Hire Kildare
    • Skip Sales
  • Construction Hoists & Mastclimbers
    • CONSTRUCTION HOISTS
    • MAST CLIMBERS
  • Lifting Equipment
    • Overhead Gantry & Jib Cranes
    • Electric, Chain & Wire Rope Hoists
    • Concrete Skips
    • Muck Tipping Skips
    • Grab, Grips & Loading Forks
    • Forklift Accessories
    • Transport and Loading Platforms
    • Civil Works Lifting Equipment
  • More
    • Testing & Certification
    • Industrial Remote Control Systems
  • CONTACT
    • Work & Projects
    • Get In Touch
    • Careers
  • HOME
  • Cranes
    • Crane Hire
      • Crane Hire Kildare
      • Crane Hire Dublin
    • Crane Sales
  • Skips
    • Skip Hire
      • Skip Hire Dublin
      • Skip Hire Kildare
    • Skip Sales
  • Construction Hoists & Mastclimbers
    • CONSTRUCTION HOISTS
    • MAST CLIMBERS
  • Lifting Equipment
    • Overhead Gantry & Jib Cranes
    • Electric, Chain & Wire Rope Hoists
    • Concrete Skips
    • Muck Tipping Skips
    • Grab, Grips & Loading Forks
    • Forklift Accessories
    • Transport and Loading Platforms
    • Civil Works Lifting Equipment
  • More
    • Testing & Certification
    • Industrial Remote Control Systems
  • CONTACT
    • Work & Projects
    • Get In Touch
    • Careers
GEDA 300 Z Boiler HoistAidan Casey2022-06-13T12:48:27+00:00
GEDA 300 Z Boiler Hoist (1)
GEDA 300 Z Boiler Hoist (2)
GEDA 300 Z Boiler Hoist (3)
GEDA 300 Z Boiler Hoist (4)

GEDA 300 Z Boiler Hoist

When repairing and maintaining silos, blast furnaces, co-generation plants and boilers etc, every minute and centimetre of space counts, since access is only possible through the small manhole only 45 cm in diameter.

So this is precisely where the materials hoist, the GEDA 300 Z Boiler Hoist, should be deployed.

The platform of the pure materials hoist can be accessed for loading/unloading and personnel may also travel in the hoist for assembling/dismantling the device.

The GEDA 300 Z Boiler Hoist can be completely dismantled into its individual parts and is also popular with customers since it can be assembled and dismantled quickly by two people in only about 40 minutes. In this regard its rack and pinion design has proven its worth as the GEDA 300 Z Boiler Hoist can be assembled significantly more quickly than wire rope hoists. All connection cords are fitted with plug and socket devices to ensure that assembly is easy and fast.

Gear damage is avoided through the use of a wearing rack and pinion.

Safety devices such as the safety gear, safety stop with an acoustic warning sound and overload protection are included as standard.

Click Here for Brochure
casey logo

Contact

Hacklow, Old Kilcullen, Co. Kildare,
Ireland.,

Tel: +353 45 485 240
Fax: +353 45 485 212

Killarney, Co. Kerry
Tel: +353 87 256 7463

Other Offices

Munster Office

Killarney, Co. Kerry
Tel: +353 87 256 7463

UK Contact Information
Tel: + 44 (78) 8788 2044

Services

Crane Hire & Sales

Construction Hoists & Mastclimbers

Skip Hire & Sale

Testing & Certification

Industrial Remote Control Systems

Information

Blog

Works & Projects

Privacy Policy

Careers

Copyright © 2021 Casey Group | All Rights Reserved | Powered by Webdesignz
Page load link
Go to Top